Logic 2 and Logic 3 Two Wire Irrigation Controllers P.O. Box 929, 556 S. Mirage Avenue Lindsay, CA 93247
Pre Wet and Fertigation option: Press set 5, the display will now be the same, except with the following changes, a “P” will show in front of Hours.
Position 4 Start Time To set start times, use set 1 to choose the desired program, use set 2 to choose the start number, (always use start 1 for the f
Definitions: Start: This is the day of the calendar that the program will start. This will be automatically set upon initial programming or set by t
Note: Program 6 can be sensor activated, such as a temperature sensor. The terminals for remote operation are located on the terminal board and marke
Position 10 Semi/ Manual/ Program Clear Master Clear – Special Feature Button Semi- use set 1 to choose the program you want to activate for one cycle
DIAMOND SETTINGS The DS as we call it, is an automatic calendar setting after run times and start times are entered. The DS will set the minimum days
To Program Receivers, the following must happen. Rotate dial to position 12, press set 5, the display will change to “set receiver ID”, press set 2 or
Programmable Receiver Number Identification Tags Hit Products has developed a user friendly, flexible means to identify the number of the field-progra
Logic “RAIN OFF” Switch Wiring Instructions Location: The rain off terminal is located on the bottom right of the Controller board labeled “RAIN OFF”
CALENDAR ODD / EVENPRE WET / FERTIGATIONMASTER CLEARPROGRAM RECEIVERFERTIGATION ONMASTER ONCALENDAR ODD / EVENPRE WET / FERTIGATIONMASTER CLEARPRO
TABLE OF CONTENTS 1. Installing the Logic 2 and Logic 3, Valve Wiring 2. Valve Wiring 3. Selecting Proper Wire Size 4. Wire Connections 5.
For Wire Size Formula is: VD = C x R x (2L) / 1000 "Ohms Law" Voltage Drop = Current x Resistance in Ohms VD = Voltage Drop C = Current (
For Wire Size Formula is: VD = C x R x (2L) / 1000 "Ohms Law" Voltage Drop = Current x Resistance in Ohms VD = Voltage Drop C = Current
21
CALENDAR ODD / EVENPRE WET / FERTIGATIONMASTER CLEARPROGRAM RECEIVERFERTIGATION ONMASTER ONNOTE: INSTALL SPD-F EVERY 300 TO 500 FEET ALON
INSTALLING THE LOGIC Mounting the controller. . .When seleting the controller installation location, make sure controller and all related wiring is
VALVE WIRING The field wiring from the controller to the receivers consists of either one or two, 2-wire runs, which connect, in series, to each valv
The Logic is designed to allow for a 7 volt loss in the field wiring. By increasing the wire size you decrease the voltage loss. The rule is the bigg
Example 2 Logic 1 To Valve 12 Ga Table Voltage drop from Chart Controller to V1 500´@ 3 valves 1.215 V.D. V1 to V2 700´@ 2 valves 1.134 V.D. Tot
Do not use pre-filled wire nut connectors as they will impede the transfer of the signal through the wire splice. TEST BEFORE BACK-FILLING TRENCH.
Controller Lightning Protection It is recommended that, in environments where either power surges or direct lightning strikes are possible, the follo
FEATURES LOGIC 2 LOGIC 3 Stations Available 1-42 1-128 Programs Available 8 16 Run Time Per Station 0-10 hours, 59 min. Max. 0-10 hours, 59 mi